FlowDiagram
Manufacturing & supply chainMermaid

Engineering change order (ECO) template

Controlling a product design change: change request, impact analysis, change control board approval, BOM and drawing updates, and effectivity on the shop floor. This flowchart template contains 17 labelled steps, 3 decision points, branches such as “No”, “Yes”, “Rework”.

Open in the editor →
  • Free — no account, no trial, no watermark
  • Fully editable shapes and connectors, not a screenshot
  • Export PNG, SVG or PDF, or share it as a link
  • Private: the diagram never leaves your browser

Steps in this flowchart

  • Change request raised
  • Engineering triage
  • Valid & needed?
  • Reject & notify requester
  • Impact analysis: cost, inventory, tooling, compliance
  • Draft ECO with redlined drawings
  • Change control board review
  • Approved?
  • Update BOM & routing in PLM
  • Release revised drawings
  • Existing stock affected?
  • Disposition: use as is, rework or scrap
  • Set effectivity date or serial
  • Sync ERP & notify suppliers
  • Train shop floor
  • First article inspection
  • ECO closed

How to use this flowchart template

  1. Click Open in the editor. The flowchart opens on a new page in FlowDiagram — nothing is uploaded and there is no sign-up.
  2. Rename, add or delete shapes and drag them where you want; connectors stay attached as things move.
  3. Drop in vendor logos from the library — 1,160 of them, including every AWS, Azure and Google Cloud service icon — or restyle it with the colour and theme controls.
  4. Prefer text? Edit the Mermaid source below and paste it in through ☰ → Import diagram (see the Mermaid editor); it imports as an editable diagram.
  5. Export to PNG, SVG or PDF, or press Ctrl+L for a link that carries the whole diagram.

Mermaid source

The whole template is the text below. Paste it into FlowDiagram, keep it in Git next to the code it describes, or hand it to an AI assistant to extend.

flowchart TD
  A([Change request raised]) --> B[Engineering triage]
  B --> C{Valid & needed?}
  C -->|No| D[Reject & notify requester]
  C -->|Yes| E[Impact analysis: cost, inventory, tooling, compliance]
  E --> F[Draft ECO with redlined drawings]
  F --> G[Change control board review]
  G --> H{Approved?}
  H -->|Rework| F
  H -->|Rejected| D
  H -->|Approved| I[Update BOM & routing in PLM]
  I --> J[Release revised drawings]
  J --> K{Existing stock affected?}
  K -->|Yes| L[Disposition: use as is, rework or scrap]
  K -->|No| M[Set effectivity date or serial]
  L --> M
  M --> N[Sync ERP & notify suppliers]
  N --> O[Train shop floor]
  O --> P[First article inspection]
  P --> Q([ECO closed])

Related: Mermaid editor · All manufacturing & supply chain templates · All 521 templates